Brand Lift · Energy Plus · EPlug — Internal Preview

Tasks — 8 September 2026

Three deliverables came in on 8 Sep 2026: the Rosh Hashanah issue of the Energy Plus Insider, an EV-charging kiosk sign, and a wrap for the kiosk enclosure. One brief per task; design folders are added as each task starts.

Current layout

Task 01 · Insider · text draft

Energy Plus Insider — Rosh Hashanah 5787

All 16 sections of the master copy poured into the page system taken from the Figma specimen: DIN 2014 Condensed and Inter, 80 px margins, one sheet per page shown as spreads. The cover photograph runs across the whole spread; placeholders are highlighted and the client's design notes sit under each page.

Open draft

Briefs

Task 01 · due Thu 10 Sep

Insider — Rosh Hashanah 5787

15 planned sections, letters from Moshe Lefkowitz and Michael Elhav locked, the rest awaiting Matthew's facts. Design direction from the client included.

Open brief
Task 02 · print

EV Charging Kiosk Sign — 4′ × 2′

Wall sign directly above the payment kiosk at an Icon Parking location. Copy locked: EV CHARGING HERE · PAY HERE ↓ · three steps.

Open brief
Task 03 · print · to clarify

EPlug Kiosk Enclosure Wrap

Branded wrap for the grey enclosure housing the payment terminal. Dimensions, faces and wording still to be confirmed.

Open brief
Foundations

UI Kit

Tokens, type scale, components, states, motion. Edit shared/tokens.css and every page picks it up.

Open

Resources

Kayco Insider — Rosh Hashanah Flipbook reference · 28 pages · Task 01 Insider — Shavuos 2026 issue Previous issue · our preview dashboard Content plan — 15 sections Shared by the client · Task 01 Dvar Torah feature spread Shared by the client · Task 01 EV team page & new hires Shared by the client · Task 01 Repository chife-mod/tasks-letter-080926-and-misc · private Figma file Created when design starts

Project stages

  1. 01
    Intake & briefs
    Done · 8 Sep
  2. 02
    Content & specs confirmed
    Open questions sent
  3. 03
    Design
    Pending
  4. 04
    Client review
    Pending
  5. 05
    Production files
    Pending
Stack
Insider → paginated layout → PDF → FlippingBook · Sign & wrap → print-ready PDF (vector, CMYK, bleed)
Documentation
Task 01 · Task 02 · Task 03 — one brief per task
Production target
Insider out by Thu 10 Sep 2026 · sign and wrap to the print vendor (dates TBC)