Brand Lift · Energy Plus · EPlug — Internal Preview

Tasks — 8 September 2026

Three deliverables came in on 8 Sep 2026: the Rosh Hashanah issue of the Energy Plus Insider, an EV-charging kiosk sign, and a wrap for the kiosk enclosure. One brief per task; design folders are added as each task starts.

Task 01 · due Thu 10 Sep

Energy Plus Insider — Rosh Hashanah 5787

Magazine-style holiday issue after the Kayco Insider model: 15 planned sections, letters from Moshe Lefkowitz and Michael Elhav locked, the rest awaiting Matthew's facts. Format (flipbook vs. email) to confirm.

Open brief
Task 01 · text draft · local preview

Insider — 16 pages as spreads

The whole master copy poured into the page system built from the Figma specimen: DIN 2014 Condensed + Inter, 80 px margins, one sheet per page shown as spreads. Placeholders highlighted, design notes under each page.

Open draft
Task 02 · print

EV Charging Kiosk Sign — 4′ × 2′

Wall-mounted sign directly above the payment kiosk at an Icon Parking location. Copy is locked: EV CHARGING HERE · PAY HERE ↓ · three steps.

Open brief
Task 03 · print · to clarify

EPlug Kiosk Enclosure Wrap

Branded wrap for the grey enclosure that houses the payment terminal — EPlug logos on the visible faces. Dimensions, faces and wording still to be confirmed.

Open brief
Foundations

UI Kit

Visual source of truth — tokens, type scale, components, states, motion. Edit shared/tokens.css or shared/components.css and every page picks it up.

Open

Resources

Kayco Insider — Rosh Hashanah Flipbook reference · 28 pages · Task 01 Insider — Shavuos 2026 issue Previous issue · our preview dashboard Content plan — 15 sections Shared by the client · Task 01 Dvar Torah feature spread Shared by the client · Task 01 EV team page & new hires Shared by the client · Task 01 Repository chife-mod/tasks-letter-080926-and-misc · private Figma file Created when design starts

Project stages

  1. 01
    Intake & briefs
    Done · 8 Sep
  2. 02
    Content & specs confirmed
    Open questions sent
  3. 03
    Design
    Pending
  4. 04
    Client review
    Pending
  5. 05
    Production files
    Pending
Stack
Insider → paginated layout → PDF → FlippingBook · Sign & wrap → print-ready PDF (vector, CMYK, bleed)
Documentation
Task 01 · Task 02 · Task 03 — one brief per task
Production target
Insider out by Thu 10 Sep 2026 · sign and wrap to the print vendor (dates TBC)